  1. Charred, Fritz-Pflaum-Hütte2026Adaptive reusemountain hut

  2. Loading 0%

  3. Charred shingles in the cirque
    Charred shingles in the cirqueExterior view of the studio proposal. The dark shingle façade sits on the existing stone base.
  4. The Fritz-Pflaum-Hütte stands at 1,865 metres in the Griesnerkar, in Austria’s Wilder Kaiser mountains. Our studio project explored alterations to the existing self-catering hut and its water and power supply. A point cloud survey of the hut and surrounding cirque provided the basis for terrain analysis and design.

    We began with the sequence after the ascent: putting down a backpack, changing shoes, hanging up wet clothing and settling beside the stove. This led to a progression from the wet entrance through an intermediate zone to the dry common room. The proposed plans reorganise these transitions and retain the stove at the centre.

    For the shingle façade, we investigated a charred timber finish and tested the charring process on boards. A separate service platform above the hut combines photovoltaics and rainwater collection in the proposal. Pipes and cables connect it to the building; its location was studied using the shadows cast by the surrounding mountains.

    The project was developed by a team of three in the summer semester of 2026 at TU Munich, in collaboration with ETH Zurich. This work subsequently led to my involvement in the design study for the German Alpine Club.

    About the project
  5. The site in the Griesnerkar
    The site in the Griesnerkar
  6. Ascent beside the rock faceSnow in the shadeScree in the cirqueA closer look at the stone
    The route to the hutPhotographs from the Griesnerkar site visit. Rock faces, old snow and scree show the terrain through which materials and equipment must reach the hut.
  7. Hut and terrain model
    Hut and terrain modelThe terrain model shows the hut’s small scale in relation to the surrounding rock faces.
  8. Wet, intermediate, dry
    Wet, intermediate, dryBlue marks the entrance, yellow the intermediate zone and red the dry common room beside the stove. The sketch organises the activities after the ascent.
  9. Ground floor: existing routes
    Ground floor: existing routesThe red lines trace guests’ movements through the existing floor plan.
  10. Ground floor: proposed sequence
    Ground floor: proposed sequence
  11. Upper floor: sleeping spaces
    Upper floor: sleeping spaces
  12. Long section through the hut
    Long section through the hut
  13. Arriving beside the stove
    Arriving beside the stoveInterior view of the common room, with timber surfaces, exposed masonry and the central stove.
  14. Extension construction
    Extension construction
  15. Shingle covering
    Shingle covering
  16. Preparing the charring testFire and draughtCharring in sectionComparing the surfaces
    Charring test with three boardsThe photographs follow the test from assembly and burning to a comparison of the surfaces. The boards form a chimney that draws the flame upwards.
  17. Sun exposure on 21 December
    Sun exposure on 21 DecemberThe colour study examines sun hours within the cirque. Blue marks areas with prolonged shade; the analysis informs the location of the photovoltaics.
  18. Hut and service platform
    Hut and service platformA shared service route carries water and electricity from the separate platform to the hut.
  19. Service platform assembly
    Service platform assemblyIn the studio proposal, the movable PV wings also collect rainwater. The storage tank sits below the structure.
  20. Service platform model
    Service platform model
  21. Winter view
    Winter viewThe visualisation places the dark shingle envelope against the snow-covered terrain.
  22. Year
    2026
    Theme
    Existing buildings & craft
    My role
    Studio design in a team of three
    Location
    Griesnerkar, Wilder Kaiser, Austria
    Supervision
    Prof. Kathrin Dörfler, Lidia Atanasova, Tizian Rein, Prof. Daniela Mitterberger
    Team
    Anna Adam, Nils Wolfsgruber, Jonathan Wahl
    Project 02 of 19.Next A Quarter for Everyone, Gesundbrunnen →

Project index

19 Projects

All projects. Select a column heading to sort.
2026Fritz-Pflaum-Hütte, Design StudyRepair and extensionExisting buildings & craft
2026Charred, Fritz-Pflaum-HütteAdaptive reuse, mountain hutExisting buildings & craft
2026A Quarter for Everyone, GesundbrunnenUrban design, competitionCity & landscape
2025YellowBruckRoadUrban design, conversionCity & landscape
2025/26InnoLith, a hemp-lime building blockMaterials, researchCircularity & materials
2025/26Halensee Goods YardArchitecture, feasibility studyCity & landscape
2025University of Konstanz Mobility HubMobility, campusCity & landscape
2025Unity in Diversity, Deutzer Hafen Block 5Urban design, competitionCity & landscape
2025CommonGroundComputation, web appComputational design & AI
2023Naós, Anchoring Perast’s FutureAdaptive reuse, workshopExisting buildings & craft
2022/23Circular interior constructionConstruction, materialsCircularity & materials
2022Mobile Tiny HouseVisualisation, timber constructionCircularity & materials
2022Stadthaus SiegelHousing, timber constructionCircularity & materials
2021Visual Programming, Reichstag DomeParametric design, GrasshopperComputational design & AI
2021The Whole Earth Catalog ReloadedTheory, researchComputational design & AI
2021Hoch Hinaus! Climbing HallSports, constructionExisting buildings & craft
2021Building Analysis, St. Martin, AachenBuilding analysis, sacred architectureExisting buildings & craft
2020An Urban Neighbourhood at BendplatzUrban design, neighbourhoodCity & landscape
2020The Pottery StudioWorkshop, constructionExisting buildings & craft